Metal Stud/Track/Furring Channel Roll Forming Machine

Model NO.: RF-DW
Control System: PLC with Touch Screen
Place of Orgin: Wuxi, China
Delivery Time: 50 Days After Deposit
Package: Film and Steel
Trademark: Suhang
Transport Package: Film and Steel
Specification: CE, SGS, ISO9001: 2008
Origin: Wuxi, Jiangsu
HS Code: 8455229090
Metal Stud/Track/Furring Channel Roll Forming Machine

1. Technical Process
Decoiler- Feeding with guide- Roll forming- Cutting - Products Collecting 

2. Technical Parameter
  Items Specifications
Material of coil Material Thickness 0.3-0.8mm galvanized 
Sizes  Width and height  63*38mm and 89*41mm
De-coiler  Weight 3 ton manual
Punching  Number  5 sets of punching moulds, two for the round holes, another for the dimple
screws, two for the rectangular holes
Forming system Rolling Speed 10-12 m/min
  Roller Stations About 13 stations forming 
  Roller Material Gcr15 Steel with quenching
  Shaft Material 45# Steel Diameter 75mm shaft
 
  Maim Motor Power 7.5 kw
  Hydraulic cutting Power 5.5 kw
Cutting
system
Material Of Cutting CR12 with quench treatment
  Hardness HRC58-62
  Tolerance +-1.5mm
  Cutting blade 1 set of cutting blade
Electrical control system Electric Source 380V, 50HZ,3 phase 
 
  Control System PLC with touch screen Japanese Panasonic and Yaskawa Brand
  Weight  About 3 tons 
  Way Of Drive 1 inch single chain
  Size of machine Length 5500mm* Width 800mm* Height 1000m

3. Assembly and commissioning
One engineer will visit Buyer's workshop for install, commission and training, The customer should ensure the pre-installation being carried out appropriately. The buyer pays the round-trip air-tickets, local cost in buyer's workshop; buyer has to pay USD100 per day, per engineer.

4. Payment Term:T/T,L/C.
30% T/T in advance and 70% T/T after inspection before shipment.
 
Warranty
 1. One year, and we will provide the technical support for the whole life.
 2. Training: the buyer should charge of visa, return ticket, food and accommodation,overseas and USD100/person/day for salary.
 3. Need one technicians 
 4. Training time: one week (contains the time of installation and adjustment)

Bending Machine

Pipe Bending Machine,Tube Bending Machine,Sheet Bending Machine,Cnc Bending Machine Working

Wuxi huaoulai automation equipment Co., Ltd , https://www.china-hol.com